|
Specifications & Dimensions Standard Piping Diagram Applications, Patents & installation
|

|
¡Ü High and low water level
control(1,200mm Max.) ¡Ü
Opening and Closing by rotating ball in the body as
a result of float¡¯s weight
and buoyancy ¡Ü
Mechanical On/Off type ¡Ü Semipermanent Operating
by means of anti-corrosion and heat- resistant
materials ¡Ü
Easy to install and maintain ¡Ü Operates totally
independent of any external power source
Balem
511 is a mechanical On /Off float control vavle, which
enables to control high and low water level in the reservoir
/ tank. The range is 300mm( Min.) to
900mm(Max.) adjustable. Designed for use with the
large Balem 431 & 441 type valve as a pilot valve,
as well as on its own in a small tank. There
are two models(Stainless Steel, Bronze) according to
body materials. Refer
to the standard piping[Fig-1] when it is installed.
In case of using it as a Pilot Valve, refer to standard
piping diagram. [Fig-2] But
a stilling wall must be provided around the float if
the liquid surface is subject to turbulence, ripples
or wind.
|
|
BALEM511
|
|
Size
|
20A(3/4")
|
|
End Connections
|
Female threaded : KSPT(Standard)
|
|
Operating Pressure
|
0.05~0.98 MPa(0.5~10kgf/§²)
|
|
Test Pressure
|
1.72MPa(17.5kgf/§²)
|
|
Materials
|
Body & Balance Weight : Bronze / Stainless Steel Levers system & Lod : Stainless Steel Float Ball : Stainless Steel Seat & O-ring : PTFE, NBR
|
|
Weight
|
1.85kg
|


|
¢º Standard Piping Diagram
|

[Fig-1] For operating by oneself in the small tank

[Fig-2] For operating as a Pilot valve in the large capacity valve

|
- Substitution for under ground / roof top, low water level ball float control valves. - Substitution for high and low levels control mechanical valves and electrodes. - Various types of oil tank float control valves.
|
|
- Refer to the standard piping diagram when installing this valve. - Install near a manhole assembled with a union for ease of maintenance, repair, and testing. - Before installation, finish to clean pipeline. - A alarm system needs to be installed in monitoring room for early detection of malfunction. - To prevent waves while filling, an induction tube with syphon braking hole must be installed.
|

|